What does the budget
need to be at P85?
Put your cost estimate and your risk register in one model, and see the budget you need at the confidence level your board picks.
See it in action.
Recorded live in Microsoft Excel, on a fictional project case.
Three questions it answers.
To set a budget the board signs.
What will it really cost?
Estimate uncertainty and discrete risks are simulated together, not added up on a calculator.
At which confidence level?
Read the budget at every reporting level from P10 to P95, including P50, P80 and P85.
Can we trust the model?
A verification suite and an audit gate check the model and flag problems before a result goes to the board.
Is this the right tool?
Who it is for
Cost engineers, estimators and risk analysts who prepare a budget or investment decision for a board, and consultants who run quantitative risk analyses for clients.
When to choose it
Choose it when you have a cost estimate broken down into cost items and need estimate uncertainty and risk events in one simulation, checked by an audit gate, before you present a P80 or P85 budget.
Another tool fits better
- Cost & Schedule Risk Analyzer if there is no detailed estimate yet and the team first needs to identify the risks together.
- Risk Contingency Allocation Tool (RCAT) if the budget is set and you need to justify and split the contingency.
What’s inside.
Everything runs in Excel on your own machine.
- Cost and risk in one modelCost items with Beta-PERT ranges and the risk register run in the same simulation.
- Correlated cost itemsCost items that share a cause move together, so the tail of the distribution is not underestimated.
- Verification suite and audit gateBuilt-in checks flag missing or inconsistent input before you report.
- Board report in one clickA Word report and a PowerPoint presentation, generated from the model on Windows.
- Mitigation trackerFollow up the response actions after the decision.
Numbers you can check.
Every package ships with a reference case and the exact values it should return.
Check your installation: in the Full edition, the unchanged reference case (Cascade Highway Tunnel, fictional; 12 cost items, 8 risk events) returns a P50 of USD 476,114,593 and a P85 of USD 515,256,546 at 10,000 iterations and seed 42. The free Demo runs a shortened version of the case and returns a P50 of USD 411.6 M and a P85 of USD 445.9 M. How we validate ›
Editions.
One license gives you the paid editions in the package; the free Demo is for everyone.
Full
The complete model with the reference case, report and presentation generator.
- Correlated Monte Carlo
- Verification suite and audit gate
- Word report and PowerPoint presentation
Demo
An evaluation edition to try the method.
- A shortened reference case: up to 8 cost items, 5 risk events and 4 schedule rows
- Up to 5,000 iterations; reports marked DEMO
- Free to share unchanged, for evaluation
System requirements.
| Software | Microsoft Excel desktop for Windows, with macros enabled. |
|---|---|
| Reports | Word and PowerPoint desktop for Windows. |
| In the package | Model, empty Start and Demo workbooks, user guide, ten-minute briefing, quick reference card, sample report and presentation, mitigation tracker, validation and verification notes, white paper, license documents. |
| Privacy | The tool runs entirely locally. Nothing is sent or collected; no internet connection is needed after download. |
| License | Personal license: one named user on at most two devices, for your own projects and the projects you analyze for clients. See the license summary. |
Try it before you buy.
The free demo runs the same engine as the full tool, on a smaller case. Run it, look around the sheets and compare your result with the reference value on this page.
- A shortened reference case: up to 8 cost items, 5 risk events and 4 schedule rows
- Up to 5,000 iterations; reports marked DEMO
- Free to share unchanged, for evaluation
Enter your name and email address; the download link arrives in your inbox right away.
Questions.
Which version of Excel do I need?
Microsoft Excel desktop for Windows, with macros enabled.
Does it work on a Mac?
Built and tested for Excel on Windows. A macOS installation guide is included, but the tool has not yet been field-tested on a Mac. On a Mac the report is written as a file that opens in Word, and the presentation becomes a handout instead of a PowerPoint deck.
Our IT department blocks macros. What now?
Windows often blocks macros in downloaded files. Right-click the file, choose Properties, tick Unblock, then reopen it and click Enable Content. The package includes the system requirements to share with your IT department. The tool runs entirely on your own computer and sends no data anywhere.
Can I use it for client projects?
Yes. The license covers your own projects and the projects you analyze for clients. You may share the reports and results you produce; the software itself stays with the licensed user. See the license summary.
How many computers can I install it on?
One named user on at most two devices, for example a desktop and a laptop. For a team, each user needs a license.
How do I receive the tool?
Right after payment you receive a download link by email. The package unzips to a folder with the workbooks, the user guide and the license documents.
Why do you ask for my email address for the free demo?
The download link is sent to your email address. If you tick the box to hear from us, we send a short message a few days later to ask how the demo went, with tips for a first run, and occasionally product news; you can unsubscribe in every message. We never share your address.
Are updates included?
Yes. Updates are free for 12 months from the date of purchase, and email support at [email protected] is included for the same period.
How are VAT and invoices handled?
Our sales platform, Payhip, handles the payment and VAT or sales tax, and sends you a receipt for your administration.
Can we pay by invoice or purchase order?
Yes. Email [email protected] with your company details, the tool and the number of users. We send a quote, and an invoice once you approve it. For three or more users we offer a team price.
Can I get a refund?
If the tool doesn’t run on your system, or doesn’t do what its page describes, email [email protected] within 14 days of purchase. We’ll fix it, or you get your money back. Not sure it fits your work? Try the free demo first: it runs the same engine.
Who can buy it?
Quantil tools are sold for business and professional use only, including independent consultants. They are not sold to consumers.
Does the tool decide for me?
No. It shows the consequences of your inputs, so you can decide with the numbers in front of you. The decision stays with your sponsor, project board or client.
Get the Quantitative Risk & Cost Integration Model (QRCIM).
- Model, empty Start and Demo workbooks, user guide, ten-minute briefing, quick reference card, sample report and presentation, mitigation tracker, validation and verification notes, white paper, license documents.
- A personal license for one user on up to two devices. Read the license
- Free updates and email support for 12 months.
- Doesn’t the tool run on your system, or doesn’t it do what this page describes? Let us know within 14 days. We’ll fix it, or you get your money back.
Buying through your purchasing department? Ask for a quote and pay by invoice. Three or more users? Ask for a team price.
Need more than one tool? Decision Chain Bundle: all 5 tools for $2,795 instead of $3,775.
Launch offer: 20% off with code LAUNCH20 at checkout, until December 31, 2026.
Secure checkout through PayhipCard or PayPalVAT handled, receipt for your recordsInvoice on request14-day guarantee
Prices in USD, excluding VAT or sales tax. For business and professional use. Payment and tax are handled by our sales platform, Payhip.
Guides on this topic.
Quantitative cost risk analysis: a practitioner's guide
How to turn a single cost estimate into a range of outcomes with probabilities, and how to turn that range into budget decisions. With a complete worked example from a fictional road and bridge project.
Read the guidePoint estimates hide risk: why boards need ranges
A single number feels firm but rarely holds. On a fictional $120 million project it has a 1% chance. How a range changes the budget decision, and how to present one to a board.
Read the guideHow to calculate contingency with Monte Carlo, step by step
From estimate ranges and risk events to a P80 contingency, in plain Excel: the formulas, a worked example and the governance rules that make the number useful.
Read the guide